Contract: A-020.00M001-3-02
Bid Summary
Contract
A-020.00M001-3-02
County
Bucks
Lackawanna
Luzerne
Montgomery
Roadway Begin
A - Northeast Extension
Mile Post Begin
30.13
Roadway End
A - Northeast Extension
Mile Post End
130.64
Project Types
ITS
Federal Project Number
Bid Opening Date/Time
5/29/2019 11:00:00 AM
Project Description
Installation of Pre-Entry Intelligent Transportation Systems Between Milepost A30.13 and Milepost A130.64 in Montgomery, Bucks, Luzerne, and Lackawanna Counties
Major Work Items
3 EA Install Full Color Full Matrix DMS Type 1, Centermount
2 EA Install Full Color Full Matrix DMS Type 2, Centermount
12 EA Install Full Color Full Matrix DMS Type 2, Type A mount
5 EA Centermount DMS Sign Structures
6,277 LBS Steel S or W Beam Posts (For DMS Type Sign A mounting)
1,412.5 LF Type 31S Guide Rail
4 EA Permanent Impact Attenuating Devices
5,317 LF HDPE Conduit
43 EA Junction Boxes, Modified (Types JB-1, JB-2)
53 LF Drilled Caisson Construction
51 CY Class 3 Excavation (Spread-Footing)
1,404 LB Reinforcement Bars, Epoxy Coated (Spread-Footing)
14 CY Class A Cement Concrete (Spread-Footing)