Contract Number: T-149.50T002-3-04
Project: Substructure Removal of Bridge B-518 and Earlston Road Construction at Milepost 154.42 in Bedford County
Opening Date: 5/22/2019 11:00:00 AM


AlternateLineItemDescriptionUnit Of MeasureQuantityUnit PriceTotal PriceQuantity 2Unit Price 2Total Price 2Quantity 3Unit Price 3Total Price 3
       NEW ENTERPRISE STONE & LIME CO., INC.  Swank Construction Company, LLC  Allison Park Contractors, Inc
   Section 0001          
 1002201-0001CLEARING AND GRUBBINGLS1.000$430,397.19$430,397.191.000$117,388.40$117,388.401.000$264,043.00$264,043.00
 2002203-0001CLASS 1 EXCAVATIONCY152639.000$8.50$1,297,431.50152639.000$19.00$2,900,141.00152639.000$16.50$2,518,543.50
 3002203-0004CLASS 1B EXCAVATIONCY35.000$111.00$3,885.0035.000$40.00$1,400.0035.000$50.00$1,750.00
 4002203-0010CLASS 1A EXCAVATION, UNDERCUTTING (BACKFILLING WITH ROCK, TYPE B)CY178.000$72.50$12,905.00178.000$75.00$13,350.00178.000$85.00$15,130.00
 5002204-0001CLASS 2 EXCAVATIONCY930.000$25.00$23,250.00930.000$25.00$23,250.00930.000$10.00$9,300.00
 6000206-0010SELECT GRANULAR MATERIAL (2RC)TON263.000$30.00$7,890.00263.000$65.00$17,095.00263.000$35.00$9,205.00
 7003208-0001SPECIAL ROLLINGHOUR8.000$25.00$200.008.000$1.00$8.008.000$150.00$1,200.00
 8000212-0014GEOTEXTILE, CLASS 4, TYPE ASY1389.000$3.00$4,167.001389.000$2.10$2,916.901389.000$5.00$6,945.00
 9000212-0016GEOTEXTILE, CLASS 4, TYPE CSY268.000$7.00$1,876.00268.000$3.00$804.00268.000$5.00$1,340.00
 10002309-0622SUPERPAVE ASPHALT MIXTURE DESIGN, HMA BASE COURSE, PG 64-22, 10 TO < 30 MILLION ESALS, 25.0 MM MIX, 4" DEPTHSY82.000$113.00$9,266.0082.000$113.66$9,320.1282.000$115.00$9,430.00
 11000311-0420SUPERPAVE ASPHALT MIXTURE DESIGN, WMA BASE COURSE, PG 64-22, 0.3 TO < 3 MILLION ESALS, 25.0 MM MIX, 3" DEPTHSY24.000$157.00$3,768.0024.000$157.33$3,775.9224.000$160.00$3,840.00
 12002350-0106SUBBASE 6" DEPTH (NO. 2A)SY5950.000$10.00$59,500.005950.000$9.00$53,550.005950.000$17.50$104,125.00
 12054350-0122SUBBASE (NO. 2A)CY75.000$60.00$4,500.0075.000$90.00$6,750.0075.000$75.00$5,625.00
 13002409-0651SUPERPAVE ASPHALT MIXTURE DESIGN, HMA WEARING COURSE, PG 64-22, 10 TO < 30 MILLION ESALS, 12.5 MM MIX, 2" DEPTH, SRL-ESY180.000$55.00$9,900.00180.000$55.48$9,986.40180.000$60.00$10,800.00
 14002409-6381SUPERPAVE ASPHALT MIXTURE DESIGN, HMA BINDER COURSE, PG 64-22, < 0.3 MILLION ESALS, 19.0 MM MIX, 4" DEPTHSY247.000$38.00$9,386.00247.000$38.44$9,494.68247.000$50.00$12,350.00
 15002409-6660SUPERPAVE ASPHALT MIXTURE DESIGN, HMA BINDER COURSE, PG 64-22, 10 TO < 30 MILLION ESALS, 19.0 MM MIX, 3" DEPTHSY82.000$115.00$9,430.0082.000$114.75$9,409.5082.000$115.00$9,430.00
 16000411-0385SUPERPAVE ASPHALT MIXTURE DESIGN, WMA WEARING COURSE, PG 64-22, < 0.3 MILLION ESALS, 9.5 MM MIX, 1 1/2" DEPTH, SRL-LSY7272.000$11.00$79,992.007272.000$10.98$79,846.567272.000$12.00$87,264.00
 17000411-0484SUPERPAVE ASPHALT MIXTURE DESIGN, WMA WEARING COURSE, PG 64-22, 0.3 TO < 3 MILLION ESALS, 9.5 MM MIX, 1 1/2" DEPTH, SRL-MSY24.000$150.00$3,600.0024.000$165.30$3,967.2024.000$165.00$3,960.00
 18000411-1395SUPERPAVE ASPHALT MIXTURE DESIGN, WMA WEARING COURSE (LEVELING), PG 64-22, < 0.3 MILLION ESALS, 9.5 MM MIX, SRL-LTON3.000$455.00$1,365.003.000$556.10$1,668.303.000$650.00$1,950.00
 19000411-6360SUPERPAVE ASPHALT MIXTURE DESIGN, WMA BINDER COURSE, PG 64-22, < 0.3 MILLION ESALS, 19.0 MM MIX, 3" DEPTHSY5526.000$18.50$102,231.005526.000$18.54$102,452.045526.000$19.00$104,994.00
 20000411-6450SUPERPAVE ASPHALT MIXTURE DESIGN, WMA BINDER COURSE, PG 64-22, 0.3 TO < 3 MILLION ESALS, 19.0 MM MIX, 2 1/2" DEPTHSY24.000$162.00$3,888.0024.000$162.32$3,895.6824.000$170.00$4,080.00
 21000460-0001BITUMINOUS TACK COATSY7357.000$0.25$1,839.257357.000$0.33$2,427.817357.000$1.00$7,357.00
 22002491-0070MILLING OF BITUMINOUS PAVEMENT SURFACE, VARIABLE DEPTHSY1772.000$7.00$12,404.001772.000$7.15$12,669.801772.000$10.00$17,720.00
EITHER23000601-039318" CORRUGATED POLYETHYLENE (PE) CULVERT PIPE, GROUP V, 7'-2.5' FILLLF6.000$187.00$1,122.006.000$550.00$3,300.006.000$250.00$1,500.00
OR24002601-936318" CORRUGATED ALUMINIZED STEEL PIPE, TYPE I, (2 2/3" X 1/2" CORRUGATIONS), 16 GAGELF6.000 6.000 6.000
EITHER25002601-040018" THERMOPLASTIC PIPE, GROUP VI, 15'-2' FILLLF376.000$132.00$49,632.00376.000$150.00$56,400.00376.000
OR26002601-701418" REINFORCED CONCRETE PIPE, TYPE A, 15' - 2' FILLLF376.000 376.000 376.000$125.00$47,000.00
EITHER27002601-040224" THERMOPLASTIC PIPE, GROUP VI, 15'-2' FILLLF59.000$127.00$7,493.0059.000$145.00$8,555.0059.000
OR28002601-702724" REINFORCED CONCRETE PIPE, TYPE A, 10' - 2' FILLLF59.000 59.000 59.000$115.00$6,785.00
 29002601-701418" REINFORCED CONCRETE PIPE, TYPE A, 15' - 2' FILLLF86.000$92.00$7,912.0086.000$200.00$17,200.0086.000$125.00$10,750.00
 30002601-702724" REINFORCED CONCRETE PIPE, TYPE A, 10' - 2' FILLLF115.000$135.00$15,525.00115.000$150.00$17,250.00115.000$125.00$14,375.00
EITHER31002604-040018" PERFORATED THERMOPLASTIC PIPE, GROUP VI, 15'-2' FILLLF452.000$128.00$57,856.00452.000$125.00$56,500.00452.000
OR32002604-701418" REINFORCED CONCRETE PIPE, TYPE A, (OPEN JOINT), 15' - 2' FILLLF452.000 452.000 452.000$100.00$45,200.00
 33002605-0010TYPE M INLET, STANDARD BOX, HEIGHT </= 10', CONDITION 1BCEACH1.000$6,000.00$6,000.001.000$5,100.00$5,100.001.000$3,000.00$3,000.00
 34002605-0012TYPE M INLET, STANDARD BOX, HEIGHT </= 10', CONDITION 2BCEACH2.000$6,000.00$12,000.002.000$5,100.00$10,200.002.000$5,000.00$10,000.00
 35002605-0022TYPE S INLET, STANDARD BOX, HEIGHT </= 10', CONDITION 2BCEACH14.000$5,100.00$71,400.0014.000$5,100.00$71,400.0014.000$3,000.00$42,000.00
 36002605-2600TYPE D ENDWALLEACH2.000$3,000.00$6,000.002.000$4,100.00$8,200.002.000$2,500.00$5,000.00
 37000608-0001MOBILIZATIONLS1.000$200,000.00$200,000.001.000$360,000.00$360,000.001.000$200,000.00$200,000.00
 38002610-00026" PIPE UNDERDRAIN TYPE I BACKFILLLF97.000$50.00$4,850.0097.000$25.00$2,425.0097.000$20.00$1,940.00
 39000610-70014" PAVEMENT BASE DRAINLF924.000$11.00$10,164.00924.000$16.00$14,784.00924.000$15.00$13,860.00
 40002616-1202CONCRETE END SECTIONS FOR 18" PIPEEACH2.000$1,800.00$3,600.002.000$1,850.00$3,700.002.000$1,000.00$2,000.00
 41002616-1204CONCRETE END SECTIONS FOR 24" PIPEEACH1.000$2,300.00$2,300.001.000$2,000.00$2,000.001.000$1,500.00$1,500.00
 42002620-0400TERMINAL SECTION, SINGLEEACH5.000$110.00$550.005.000$100.00$500.005.000$100.00$500.00
 43002620-1250VEHICLE ATTENUATING TERMINAL END TREATMENT (V.A.T.E.T.), TYPE II, TEST LEVEL 3 - MASH (ENERGY ABSORBING TERMINALS, TANGENT)EACH1.000$2,700.00$2,700.001.000$2,500.00$2,500.001.000$4,000.00$4,000.00
 44002620-1600TYPE 31-S GUIDE RAILLF512.500$45.50$23,318.75512.500$28.00$14,350.00512.500$30.00$15,375.00
 45002620-1660TYPE 31-STRONG POST ANCHOR TERMINALEACH1.000$1,900.00$1,900.001.000$1,700.00$1,700.001.000$2,000.00$2,000.00
 46002623-0058REMOVE AND STORE SINGLE FACE CONCRETE BARRIER, 52"LF530.000$22.00$11,660.00530.000$30.36$16,090.80530.000$20.00$10,600.00
 47002624-0001RIGHT-OF-WAY FENCE, TYPE 1LF766.000$21.00$16,086.00766.000$19.25$14,745.50766.000$20.00$15,320.00
 48002624-0100RIGHT-OF-WAY FENCE, TYPE 2LF2610.000$15.00$39,150.002610.000$11.85$30,928.502610.000$15.00$39,150.00
 49002624-0300END POSTS FOR TYPE 1 RIGHT-OF-WAY FENCEEACH4.000$218.00$872.004.000$200.00$800.004.000$250.00$1,000.00
 50002624-0301END POSTS FOR TYPE 2 RIGHT-OF-WAY FENCEEACH8.000$163.00$1,304.008.000$150.00$1,200.008.000$250.00$2,000.00
 51002624-0400CORNER POSTS FOR TYPE 1 RIGHT-OF-WAY FENCEEACH6.000$304.00$1,824.006.000$280.00$1,680.006.000$250.00$1,500.00
 52002624-0401CORNER POSTS FOR TYPE 2 RIGHT-OF-WAY FENCEEACH20.000$207.00$4,140.0020.000$190.00$3,800.0020.000$250.00$5,000.00
 53002624-0500PULL POSTS FOR TYPE 1 RIGHT-OF-WAY FENCEEACH2.000$303.00$606.002.000$280.00$560.002.000$500.00$1,000.00
 54002624-0501PULL POSTS FOR TYPE 2 RIGHT-OF-WAY FENCEEACH9.000$207.00$1,863.009.000$190.00$1,710.009.000$250.00$2,250.00
 55002624-0725VEHICULAR GATE FOR TYPE 1 RIGHT-OF-WAY FENCE, 15-FOOT OPENINGEACH1.000$3,500.00$3,500.001.000$3,200.00$3,200.001.000$3,500.00$3,500.00
 56002624-0740VEHICULAR GATE FOR TYPE 2 RIGHT-OF-WAY FENCE, 10-FOOT OPENINGEACH1.000$2,300.00$2,300.001.000$2,100.00$2,100.001.000$3,500.00$3,500.00
 57000626-0010GABIONS, TYPE BCY270.000$225.00$60,750.00270.000$70.00$18,900.00270.000$375.00$101,250.00
 58000626-0030CORROSION RESISTANT GABIONS, TYPE BCY70.000$300.00$21,000.0070.000$120.00$8,400.0070.000$500.00$35,000.00
 59002627-1001FURNISH AND INSTALL TEMPORARY CONCRETE BARRIERLF1979.000$19.00$37,601.001979.000$25.00$49,475.001979.000$50.00$98,950.00
 60002627-2001REMOVE TEMPORARY CONCRETE BARRIERLF1979.000$4.00$7,916.001979.000$9.25$18,305.751979.000$25.00$49,475.00
 61002628-0001RESET TEMPORARY CONCRETE BARRIERLF2658.000$1.50$3,987.002658.000$6.50$17,277.002658.000$15.00$39,870.00
 62002686-0010CONSTRUCTION SURVEYING, TYPE ALS1.000$50,000.00$50,000.001.000$50,000.00$50,000.001.000$75,000.00$75,000.00
 63002696-0200REPAIR OF TEMPORARY IMPACT ATTENUATING DEVICEPDA1.000$5,000.00$5,000.001.000$5,000.00$5,000.001.000$5,000.00$5,000.00
 64002696-0610TEMPORARY IMPACT ATTENUATING DEVICE, TYPE V (STANDARD), TEST LEVEL 3EACH2.000$3,350.00$6,700.002.000$3,085.00$6,170.002.000$5,000.00$10,000.00
 65002697-0639RESET TEMPORARY IMPACT ATTENUATING DEVICE, TYPE V (STANDARD), TEST LEVEL 3EACH2.000$1,155.00$2,310.002.000$1,065.00$2,130.002.000$2,500.00$5,000.00
 66000703-0022NO. 8 COARSE AGGREGATECY11.000$150.00$1,650.0011.000$100.00$1,100.0011.000$100.00$1,100.00
 67000703-0025NO. 57 COARSE AGGREGATECY44.000$86.00$3,784.0044.000$100.00$4,400.0044.000$75.00$3,300.00
 68000703-0026NO. 3 COARSE AGGREGATECY258.000$75.00$19,350.00258.000$150.00$38,700.00258.000$65.00$16,770.00
 69004802-0001TOPSOIL FURNISHED AND PLACED, COMPOST MIXTURECY248.000$40.00$9,920.00248.000$70.00$17,360.00248.000$75.00$18,600.00
 70002804-0013SEEDING AND SOIL SUPPLEMENTS - FORMULA DLB11.000$100.00$1,100.0011.000$100.00$1,100.0011.000$50.00$550.00
 71002804-0020SEEDING AND SOIL SUPPLEMENTS - FORMULA LLB851.000$24.00$20,424.00851.000$4.90$4,169.90851.000$20.00$17,020.00
 72002804-0049SEEDING AND SOIL SUPPLEMENTS - WETLAND MIXTURELB6.000$217.00$1,302.006.000$220.00$1,320.006.000$500.00$3,000.00
 73002804-0105SEEDING AND SOIL SUPPLEMENTS - SEASONALLY FLOODED SEED MIXTURELB5.000$217.00$1,085.005.000$180.00$900.005.000$500.00$2,500.00
 74002805-0022MULCHING - STRAWTON3.000$540.00$1,620.003.000$490.00$1,470.003.000$2,500.00$7,500.00
 75000806-0113TEMPORARY SHORT-TERM, ROLLED EROSION CONTROL PRODUCT, TYPE 2DSY10854.000$1.75$18,994.5010854.000$1.40$15,195.6010854.000$2.00$21,708.00
 76002808-7130TUSSOCK SEDGE (PEAT POT)EACH367.000$33.00$12,111.00367.000$5.00$1,835.00367.000$35.00$12,845.00
 77002845-0001EROSION AND SEDIMENTATION CONTROL DURING CONSTRUCTIONPDA1.000$20,000.00$20,000.001.000$20,000.00$20,000.001.000$20,000.00$20,000.00
 78002849-0001ROCK CONSTRUCTION ENTRANCEEACH3.000$1,000.00$3,000.003.000$3,100.00$9,300.003.000$7,500.00$22,500.00
 79002850-0022ROCK LINING, CLASS R-4SY342.000$37.00$12,654.00342.000$32.00$10,944.00342.000$50.00$17,100.00
 80002850-0023ROCK LINING, CLASS R-5SY19.000$57.00$1,083.0019.000$100.00$1,900.0019.000$60.00$1,140.00
 81002850-0031DUMP ROCK, CLASS R-3CY2.000$178.00$356.002.000$60.00$120.002.000$150.00$300.00
 82002858-0010SEDIMENT FILTER BAGEACH3.000$100.00$300.003.000$1,500.00$4,500.003.000$350.00$1,050.00
 83000859-0021ANTI-SEEP COLLAREACH2.000$2,000.00$4,000.002.000$1,900.00$3,800.002.000$1,000.00$2,000.00
 84002860-0003INLET FILTER BAG FOR TYPE M OR TYPE S INLETEACH18.000$50.00$900.0018.000$400.00$7,200.0018.000$250.00$4,500.00
 85000867-0012COMPOST FILTER SOCK, 12" DIAMETERLF283.000$7.50$2,122.50283.000$4.12$1,165.96283.000$10.00$2,830.00
 86000867-0018COMPOST FILTER SOCK, 18" DIAMETERLF910.000$10.50$9,555.00910.000$7.00$6,370.00910.000$12.00$10,920.00
 87000874-0001TEMPORARY RISER PIPE ASSEMBLYEACH1.000$4,000.00$4,000.001.000$17,000.00$17,000.001.000$5,000.00$5,000.00
 88000875-0001CONCRETE OUTLET STRUCTUREEACH1.000$6,650.00$6,650.001.000$10,503.25$10,503.251.000$5,000.00$5,000.00
 89002901-0001MAINTENANCE AND PROTECTION OF TRAFFICLS1.000$125,000.00$125,000.001.000$775,000.00$775,000.001.000$250,000.00$250,000.00
 90002901-0203ARROW PANELEACH2.000$2,150.00$4,300.002.000$3,000.00$6,000.002.000$5,000.00$10,000.00
 91002901-0498PORTABLE CHANGEABLE MESSAGE SIGNS, 3 LINES, 8 CHARACTERS PER LINEEACH4.000$5,000.00$20,000.004.000$11,000.00$44,000.004.000$10,000.00$40,000.00
 92002901-0499PORTABLE CHANGEABLE MESSAGE SIGNS, 3 LINES, 12 CHARACTERS PER LINEEACH2.000$5,000.00$10,000.002.000$11,000.00$22,000.002.000$10,000.00$20,000.00
 93002901-0501SHADOW VEHICLE WITH TRUCK MOUNTED ATTENUATOR (TMA)EACH2.000$50,000.00$100,000.002.000$6,000.00$12,000.002.000$10,000.00$20,000.00
 94000931-0003POST MOUNTED SIGNS, TYPE B, STEEL SQUARE POSTSF85.700$57.00$4,884.9085.700$52.35$4,486.4085.700$45.00$3,856.50
 95002934-0002POST MOUNTED SIGNS, TYPE ESF25.000$170.00$4,250.0025.000$156.45$3,911.2525.000$100.00$2,500.00
 96002935-0001POST MOUNTED SIGNS, TYPE FSF16.000$31.00$496.0016.000$28.75$460.0016.000$50.00$800.00
 97000962-10004" WHITE WATERBORNE PAVEMENT MARKINGSLF20.000$1.35$27.0020.000$1.25$25.0020.000$1.00$20.00
 98002962-100312" WHITE WATERBORNE PAVEMENT MARKINGSLF1979.000$1.10$2,176.901979.000$1.00$1,979.001979.000$4.00$7,916.00
 99000962-10054" YELLOW WATERBORNE PAVEMENT MARKINGSLF1454.000$1.35$1,962.901454.000$1.25$1,817.501454.000$1.00$1,454.00
 100000971-0001REMOVE POST MOUNTED SIGNS, TYPE BEACH2.000$49.00$98.002.000$45.00$90.002.000$250.00$500.00
 101002018-0001REMOVAL OF BRIDGE, B-518, MP 154.42LS1.000$50,000.00$50,000.001.000$450,000.00$450,000.001.000$175,000.00$175,000.00
 102004000-0001PERMEABLE BLOCK PAVERSY181.000$105.00$19,005.00181.000$125.00$22,625.00181.000$100.00$18,100.00
 103004000-0002DEMOLITION OF SHED STRUCTURE, PARCEL #1LS1.000$1.00$1.001.000$500.00$500.001.000$2,500.00$2,500.00
 104004000-0005SEDIMENT BASIN CONVERSION TO PERMANENT INFILTRATION BASINLS1.000$6,300.00$6,300.001.000$85,000.00$85,000.001.000$5,000.00$5,000.00
 105004000-0006LABORATORY ANALYSIS OF SOIL EXCAVATIONEACH60.000$0.01$0.6060.000$200.00$12,000.0060.000$1,000.00$60,000.00
 106004000-0007OFF-SITE DISPOSAL OF SOIL MATERIAL - REGULATED FILLTON40255.000$0.01$402.5540255.000$0.10$4,025.5040255.000$43.00$1,730,965.00
 107004000-0008OFF-SITE DISPOSAL OF SOIL MATERIAL - RESIDUAL WASTETON10064.000$0.01$100.6410064.000$0.10$1,006.4010064.000$41.00$412,624.00
 99999 TOTAL   $3,360,929.18  $5,921,383.62  $7,100,000.00